PRINCIPAL CONTRACTOR: Bovis Lend Lease CLIENT: Catalyst Education VALUE: £907,000.00
WORKS PACKAGE: Internal Partitions

Unity College was the largest of the 4 BSF’s secured by CLM. This project brought new challenges to CLM as the works package was categorised ‘high risk’ by Bovis Lead Lease. This was due to partition heights exceeding 10 metres in areas. Therefore, the supervision and training requirements increased from previous BSF’s undertaken by CLM.

High performance partitions were required throughout the building. CLM were employed as the ‘specialist contractor’ assisting British Gypsum in producing a site specific project pack, ensuring acoustic requirements and difficult details were achieved on a complex build.

Careful consideration had to be given after protests from residents and councillors stalled plans for the school. Fencing was firstly put up around the site and then over the Summer period a temporary bridge was constructed over the river for all the construction traffic. CLM scheduled delivery times to cause the least amount of disturbance to the residential area.

This project was constructed on time, within budget and with a considerate workforce.